Loading Lumber at Noyo Harbour in Fort Bragg

Whilst the Union Lumber Company (ULC) loaded lumber off of the 980 foot long pier in Soldier Bay off of Fort Bragg lumber was also loaded “under the wire” off of the cliff on the north side of the Noyo River. Here’s the pics I have collected showing loading in progress:

[Click on the photos to enlarge]

Loading by a sling

Loading by a sling

Rohilla loading under the sling

Rohilla loading under the sling

1909 Bark British Yeoman being loaded under the wire in Noyo Harbour

1909 Bark British Yeoman being loaded under the wire in Noyo Harbour

Watching the loading

Watching the loading